House extensions in Finsbury Park

Finsbury Park sits in Islington, where the streets are dominated by 1930s suburban semis where a rear-and-side wraparound is the obvious move. The build that pays back most reliably here is a glazed side-return infill that pulls south light into a dark middle room.

Typical all-in (inc VAT)
£123k–£183k
Build rate per m²
£2975–£4550
On-site programme
12–20 weeks

What we build in Finsbury Park

Most Finsbury Park projects we scope fall into three buckets: a side-return or rear infill that fixes a dark galley kitchen, a full-width rear extension that opens the ground floor to the garden, and a rear-plus-loft package that adds a bedroom while the scaffold is already up. Classic 1840–1880 London stock brick terraces, many in conservation zones.

Side-return kitchen extensionRear extensionBasement dig-out

Extension costs in Finsbury Park

A mid-spec 25 m² extension in Finsbury Park typically lands between £123,000 and £183,000 all-in — that figure includes professional fees, planning and Building Control, party wall, a 12% contingency and VAT at 20%. Ex-VAT build rates run £2975–£4550 per m² depending on glazing, structural spans and kitchen spend.

ProjectSizeFinsbury Park all-in
Side return infill15–20 m²£92k – £137k
Full-width rear20–30 m²£123k – £183k
Wraparound30–45 m²£178k – £265k
Double-storey rear40–60 m²£240k – £357k

Planning permission in Finsbury Park

Islington is generally supportive of well-detailed rear/side-return extensions but strict on basement schemes since the 2016 policy tightening. Expect a full application in Barnsbury and Canonbury conservation areas.

Before you assume permitted development applies to your street, check whether your street falls inside a conservation area or an Article 4 direction — both are common in Islington and both remove PD rights for rear and side extensions. Our London planning guide walks through the tests in order.

Party wall and neighbours

Terraces with vaults under the pavement — expect a section 6 notice on basement work.

Serve notice at least two months before you break ground. Budget £1,200–£2,400 per adjoining owner if they dissent and appoint their own surveyor — see the Party Wall Act guide.

Access, logistics and site set-up

Access is typically through the house, so expect dust protection, a boarded route and a skip permit from the council.

Every quote we issue for Finsbury Park prices skip permits, parking suspensions, protection and welfare explicitly in the preliminaries — so the number you sign is the number you pay.

Value added in Finsbury Park

Well-executed extensions here tend to return a healthy share of their cost at resale, particularly where they add a genuine third or fourth bedroom.

Typical programme

  1. Weeks 0–4Measured survey, design and structural calcs
  2. Weeks 4–12Planning or lawful development certificate, party wall notices
  3. Weeks 12–16Tender, builder selection and contract signing
  4. Weeks 16–34On site: groundworks, shell, watertight, first and second fix
  5. Week 35Building Control sign-off, snagging and handover

Full detail in the London extension timeline guide.

Why homeowners in Finsbury Park use us

  • KYB-verified builders only
  • Live Islington project experience
  • Itemised fixed-price specifications
  • Insurance, warranty and accreditation checks
Call now WhatsApp