Gidea Park, London
Areas · Havering · East London
Gidea Park · RM1 · RM2 · RM11

House extensions in Gidea Park

Gidea Park sits in Havering, where the streets are dominated by post-war and inter-war housing with straightforward foundations and fewer planning constraints. The build that pays back most reliably here is a double-storey rear that adds a bedroom and en-suite above the new kitchen.

Typical all-in (inc VAT)
£85k–£135k
Build rate per m²
£2625–£4000
On-site programme
12–20 weeks

What we build in Gidea Park

Most Gidea Park projects we scope fall into three buckets: a side-return or rear infill that fixes a dark galley kitchen, a full-width rear extension that opens the ground floor to the garden, and a rear-plus-loft package that adds a bedroom while the scaffold is already up. 1930s semis and detached homes, Gidea Park's Arts & Crafts conservation area.

Rear extensionWraparoundLoft

Extension costs in Gidea Park

A mid-spec 25 m² extension in Gidea Park typically lands between £85,000 and £135,000 all-in — that figure includes professional fees, planning and Building Control, party wall, a 12% contingency and VAT at 20%. Ex-VAT build rates run £2625–£4000 per m² depending on glazing, structural spans and kitchen spend.

ProjectSizeGidea Park all-in
Side return infill15–20 m²£64k – £101k
Full-width rear20–30 m²£85k – £135k
Wraparound30–45 m²£123k – £196k
Double-storey rear40–60 m²£166k – £263k

Planning permission in Gidea Park

Straightforward planning outside Gidea Park and Emerson Park conservation zones. PD pathway is well-trodden.

Before you assume permitted development applies to your street, check whether your street falls inside a conservation area or an Article 4 direction — both are common in Havering and both remove PD rights for rear and side extensions. Our London planning guide walks through the tests in order.

Party wall and neighbours

Semi and detached — often no party wall or a single notice.

Serve notice at least two months before you break ground. Budget £1,200–£2,400 per adjoining owner if they dissent and appoint their own surveyor — see the Party Wall Act guide.

Access, logistics and site set-up

Access is typically through the house, so expect dust protection, a boarded route and a skip permit from the council.

Every quote we issue for Gidea Park prices skip permits, parking suspensions, protection and welfare explicitly in the preliminaries — so the number you sign is the number you pay.

Value added in Gidea Park

Adding floor area is usually cheaper than moving once stamp duty, agent fees and moving costs are counted.

Typical programme

  1. Weeks 0–4Measured survey, design and structural calcs
  2. Weeks 4–12Planning or lawful development certificate, party wall notices
  3. Weeks 12–16Tender, builder selection and contract signing
  4. Weeks 16–34On site: groundworks, shell, watertight, first and second fix
  5. Week 35Building Control sign-off, snagging and handover

Full detail in the London extension timeline guide.

Why homeowners in Gidea Park use us

  • KYB-verified builders only
  • Live Havering project experience
  • Itemised fixed-price specifications
  • Insurance, warranty and accreditation checks
Call now WhatsApp