What we build in Hornsey
Most Hornsey projects we scope fall into three buckets: a side-return or rear infill that fixes a dark galley kitchen, a full-width rear extension that opens the ground floor to the garden, and a rear-plus-loft package that adds a bedroom while the scaffold is already up. Late-Victorian terraces (Crouch End, Harringay ladder), 1930s semis in Muswell Hill.
Extension costs in Hornsey
A mid-spec 25 m² extension in Hornsey typically lands between £111,000 and £166,000 all-in — that figure includes professional fees, planning and Building Control, party wall, a 12% contingency and VAT at 20%. Ex-VAT build rates run £2925–£4450 per m² depending on glazing, structural spans and kitchen spend.
| Project | Size | Hornsey all-in |
|---|---|---|
| Side return infill | 15–20 m² | £83k – £125k |
| Full-width rear | 20–30 m² | £111k – £166k |
| Wraparound | 30–45 m² | £161k – £241k |
| Double-storey rear | 40–60 m² | £216k – £324k |
Planning permission in Hornsey
Haringey is generally receptive to modest ground-floor extensions but the Crouch End and Muswell Hill conservation areas add design scrutiny. Front elevations are protected.
Before you assume permitted development applies to your street, check whether your street falls inside a conservation area or an Article 4 direction — both are common in Haringey and both remove PD rights for rear and side extensions. Our London planning guide walks through the tests in order.
Party wall and neighbours
Ladder-street terraces almost always trigger two party wall notices.
Serve notice at least two months before you break ground. Budget £1,200–£2,400 per adjoining owner if they dissent and appoint their own surveyor — see the Party Wall Act guide.
Access, logistics and site set-up
Rear access via a side alley or garden gate speeds up muck-away and cuts labour cost noticeably.
Every quote we issue for Hornsey prices skip permits, parking suspensions, protection and welfare explicitly in the preliminaries — so the number you sign is the number you pay.
Value added in Hornsey
Well-executed extensions here tend to return a healthy share of their cost at resale, particularly where they add a genuine third or fourth bedroom.
Typical programme
- Weeks 0–4Measured survey, design and structural calcs
- Weeks 4–12Planning or lawful development certificate, party wall notices
- Weeks 12–16Tender, builder selection and contract signing
- Weeks 16–34On site: groundworks, shell, watertight, first and second fix
- Week 35Building Control sign-off, snagging and handover
Full detail in the London extension timeline guide.
Why homeowners in Hornsey use us
- KYB-verified builders only
- Live Haringey project experience
- Itemised fixed-price specifications
- Insurance, warranty and accreditation checks