House extensions in Northolt

Northolt sits in Ealing, where the streets are dominated by converted period houses and maisonettes where structural and access sequencing matters. The build that pays back most reliably here is an L-shaped wraparound that finally squares off an awkward kitchen.

Typical all-in (inc VAT)
£107k–£162k
Build rate per m²
£2800–£4300
On-site programme
12–20 weeks

What we build in Northolt

Most Northolt projects we scope fall into three buckets: a side-return or rear infill that fixes a dark galley kitchen, a full-width rear extension that opens the ground floor to the garden, and a rear-plus-loft package that adds a bedroom while the scaffold is already up. Edwardian villas (Ealing Broadway), 1930s semis (Northolt, Greenford), Victorian terraces (Acton).

WraparoundRear extensionDouble-storey rear

Extension costs in Northolt

A mid-spec 25 m² extension in Northolt typically lands between £107,000 and £162,000 all-in — that figure includes professional fees, planning and Building Control, party wall, a 12% contingency and VAT at 20%. Ex-VAT build rates run £2800–£4300 per m² depending on glazing, structural spans and kitchen spend.

ProjectSizeNortholt all-in
Side return infill15–20 m²£80k – £122k
Full-width rear20–30 m²£107k – £162k
Wraparound30–45 m²£155k – £235k
Double-storey rear40–60 m²£209k – £316k

Planning permission in Northolt

Ealing has a strong SPD for extensions. Conservation areas in Bedford Park, Pitshanger and Ealing Green require design that respects the Arts & Crafts idiom.

Before you assume permitted development applies to your street, check whether your street falls inside a conservation area or an Article 4 direction — both are common in Ealing and both remove PD rights for rear and side extensions. Our London planning guide walks through the tests in order.

Party wall and neighbours

Mixed — semis in the west, terraces in Acton mean two party walls.

Serve notice at least two months before you break ground. Budget £1,200–£2,400 per adjoining owner if they dissent and appoint their own surveyor — see the Party Wall Act guide.

Access, logistics and site set-up

Tight on-street parking means bay suspensions and timed deliveries — your builder should price this, not absorb it.

Every quote we issue for Northolt prices skip permits, parking suspensions, protection and welfare explicitly in the preliminaries — so the number you sign is the number you pay.

Value added in Northolt

Light and layout move value here more than raw square metres — spend on glazing and ceiling height.

Typical programme

  1. Weeks 0–4Measured survey, design and structural calcs
  2. Weeks 4–12Planning or lawful development certificate, party wall notices
  3. Weeks 12–16Tender, builder selection and contract signing
  4. Weeks 16–34On site: groundworks, shell, watertight, first and second fix
  5. Week 35Building Control sign-off, snagging and handover

Full detail in the London extension timeline guide.

Why homeowners in Northolt use us

  • KYB-verified builders only
  • Live Ealing project experience
  • Itemised fixed-price specifications
  • Insurance, warranty and accreditation checks