Old Bexley, London
Areas · Bexley · South London
Old Bexley · DA5 · DA6 · DA7

House extensions in Old Bexley

Old Bexley sits in Bexley, where the streets are dominated by long Victorian terraces with narrow side returns and original rear closet wings. The build that pays back most reliably here is a glazed side-return infill that pulls south light into a dark middle room.

Typical all-in (inc VAT)
£89k–£139k
Build rate per m²
£2625–£4000
On-site programme
12–20 weeks

What we build in Old Bexley

Most Old Bexley projects we scope fall into three buckets: a side-return or rear infill that fixes a dark galley kitchen, a full-width rear extension that opens the ground floor to the garden, and a rear-plus-loft package that adds a bedroom while the scaffold is already up. 1930s semis and detached homes, some post-war.

Rear extensionWraparoundLoft

Extension costs in Old Bexley

A mid-spec 25 m² extension in Old Bexley typically lands between £89,000 and £139,000 all-in — that figure includes professional fees, planning and Building Control, party wall, a 12% contingency and VAT at 20%. Ex-VAT build rates run £2625–£4000 per m² depending on glazing, structural spans and kitchen spend.

ProjectSizeOld Bexley all-in
Side return infill15–20 m²£67k – £104k
Full-width rear20–30 m²£89k – £139k
Wraparound30–45 m²£129k – £202k
Double-storey rear40–60 m²£174k – £271k

Planning permission in Old Bexley

One of London's easiest boroughs for PD extensions.

Before you assume permitted development applies to your street, check whether your street falls inside a conservation area or an Article 4 direction — both are common in Bexley and both remove PD rights for rear and side extensions. Our London planning guide walks through the tests in order.

Party wall and neighbours

Semi-detached — one party wall notice typical.

Serve notice at least two months before you break ground. Budget £1,200–£2,400 per adjoining owner if they dissent and appoint their own surveyor — see the Party Wall Act guide.

Access, logistics and site set-up

Narrow roads limit lorry size, so materials arrive in smaller loads; a good programme allows for it.

Every quote we issue for Old Bexley prices skip permits, parking suspensions, protection and welfare explicitly in the preliminaries — so the number you sign is the number you pay.

Value added in Old Bexley

Buyers in this area consistently pay a premium for open-plan kitchen-diners with direct garden access.

Typical programme

  1. Weeks 0–4Measured survey, design and structural calcs
  2. Weeks 4–12Planning or lawful development certificate, party wall notices
  3. Weeks 12–16Tender, builder selection and contract signing
  4. Weeks 16–34On site: groundworks, shell, watertight, first and second fix
  5. Week 35Building Control sign-off, snagging and handover

Full detail in the London extension timeline guide.

Why homeowners in Old Bexley use us

  • KYB-verified builders only
  • Live Bexley project experience
  • Itemised fixed-price specifications
  • Insurance, warranty and accreditation checks
Call now WhatsApp