Pinner, London
Areas · Harrow · West London
Pinner · HA1 · HA2 · HA3

House extensions in Pinner

Pinner sits in Harrow, where the streets are dominated by 1930s suburban semis where a rear-and-side wraparound is the obvious move. The build that pays back most reliably here is a rear extension paired with a loft dormer, done under one scaffold and one contract.

Typical all-in (inc VAT)
£84k–£139k
Build rate per m²
£2675–£4075
On-site programme
12–20 weeks

What we build in Pinner

Most Pinner projects we scope fall into three buckets: a side-return or rear infill that fixes a dark galley kitchen, a full-width rear extension that opens the ground floor to the garden, and a rear-plus-loft package that adds a bedroom while the scaffold is already up. 1930s Metroland semis and detached, larger Arts & Crafts in Pinner.

WraparoundDouble-storey rearLoft

Extension costs in Pinner

A mid-spec 25 m² extension in Pinner typically lands between £84,000 and £139,000 all-in — that figure includes professional fees, planning and Building Control, party wall, a 12% contingency and VAT at 20%. Ex-VAT build rates run £2675–£4075 per m² depending on glazing, structural spans and kitchen spend.

ProjectSizePinner all-in
Side return infill15–20 m²£63k – £104k
Full-width rear20–30 m²£84k – £139k
Wraparound30–45 m²£122k – £202k
Double-storey rear40–60 m²£164k – £271k

Planning permission in Pinner

Pinner and Harrow-on-the-Hill conservation areas add design review. Elsewhere Harrow is a very PD-friendly borough.

Before you assume permitted development applies to your street, check whether your street falls inside a conservation area or an Article 4 direction — both are common in Harrow and both remove PD rights for rear and side extensions. Our London planning guide walks through the tests in order.

Party wall and neighbours

Semi-detached: one party wall neighbour typical.

Serve notice at least two months before you break ground. Budget £1,200–£2,400 per adjoining owner if they dissent and appoint their own surveyor — see the Party Wall Act guide.

Access, logistics and site set-up

Rear access via a side alley or garden gate speeds up muck-away and cuts labour cost noticeably.

Every quote we issue for Pinner prices skip permits, parking suspensions, protection and welfare explicitly in the preliminaries — so the number you sign is the number you pay.

Value added in Pinner

Well-executed extensions here tend to return a healthy share of their cost at resale, particularly where they add a genuine third or fourth bedroom.

Typical programme

  1. Weeks 0–4Measured survey, design and structural calcs
  2. Weeks 4–12Planning or lawful development certificate, party wall notices
  3. Weeks 12–16Tender, builder selection and contract signing
  4. Weeks 16–34On site: groundworks, shell, watertight, first and second fix
  5. Week 35Building Control sign-off, snagging and handover

Full detail in the London extension timeline guide.

Why homeowners in Pinner use us

  • KYB-verified builders only
  • Live Harrow project experience
  • Itemised fixed-price specifications
  • Insurance, warranty and accreditation checks
Call now WhatsApp