What we build in Wimbledon Park
Most Wimbledon Park projects we scope fall into three buckets: a side-return or rear infill that fixes a dark galley kitchen, a full-width rear extension that opens the ground floor to the garden, and a rear-plus-loft package that adds a bedroom while the scaffold is already up. Victorian/Edwardian villas in Wimbledon, 1930s semis in Raynes Park and Morden.
Extension costs in Wimbledon Park
A mid-spec 25 m² extension in Wimbledon Park typically lands between £108,000 and £168,000 all-in — that figure includes professional fees, planning and Building Control, party wall, a 12% contingency and VAT at 20%. Ex-VAT build rates run £2900–£4425 per m² depending on glazing, structural spans and kitchen spend.
| Project | Size | Wimbledon Park all-in |
|---|---|---|
| Side return infill | 15–20 m² | £81k – £126k |
| Full-width rear | 20–30 m² | £108k – £168k |
| Wraparound | 30–45 m² | £157k – £244k |
| Double-storey rear | 40–60 m² | £211k – £328k |
Planning permission in Wimbledon Park
Wimbledon conservation areas (Village, Common-side) demand high design quality. Merton has a well-documented householder extension SPD.
Before you assume permitted development applies to your street, check whether your street falls inside a conservation area or an Article 4 direction — both are common in Merton and both remove PD rights for rear and side extensions. Our London planning guide walks through the tests in order.
Party wall and neighbours
Mixed — Wimbledon villas often detached, Mitcham/Raynes Park usually semi.
Serve notice at least two months before you break ground. Budget £1,200–£2,400 per adjoining owner if they dissent and appoint their own surveyor — see the Party Wall Act guide.
Access, logistics and site set-up
Tight on-street parking means bay suspensions and timed deliveries — your builder should price this, not absorb it.
Every quote we issue for Wimbledon Park prices skip permits, parking suspensions, protection and welfare explicitly in the preliminaries — so the number you sign is the number you pay.
Value added in Wimbledon Park
Light and layout move value here more than raw square metres — spend on glazing and ceiling height.
Typical programme
- Weeks 0–4Measured survey, design and structural calcs
- Weeks 4–12Planning or lawful development certificate, party wall notices
- Weeks 12–16Tender, builder selection and contract signing
- Weeks 16–34On site: groundworks, shell, watertight, first and second fix
- Week 35Building Control sign-off, snagging and handover
Full detail in the London extension timeline guide.
Why homeowners in Wimbledon Park use us
- KYB-verified builders only
- Live Merton project experience
- Itemised fixed-price specifications
- Insurance, warranty and accreditation checks