What we build in Wood Street
Most Wood Street projects we scope fall into three buckets: a side-return or rear infill that fixes a dark galley kitchen, a full-width rear extension that opens the ground floor to the garden, and a rear-plus-loft package that adds a bedroom while the scaffold is already up. Victorian terraces (Walthamstow Village), Edwardian bay-fronts, 1930s semis in Chingford.
Extension costs in Wood Street
A mid-spec 25 m² extension in Wood Street typically lands between £107,000 and £162,000 all-in — that figure includes professional fees, planning and Building Control, party wall, a 12% contingency and VAT at 20%. Ex-VAT build rates run £2800–£4300 per m² depending on glazing, structural spans and kitchen spend.
| Project | Size | Wood Street all-in |
|---|---|---|
| Side return infill | 15–20 m² | £80k – £122k |
| Full-width rear | 20–30 m² | £107k – £162k |
| Wraparound | 30–45 m² | £155k – £235k |
| Double-storey rear | 40–60 m² | £209k – £316k |
Planning permission in Wood Street
Walthamstow Village conservation area is strict; elsewhere planning is workmanlike. E17 side-returns are very common and well-precedented.
Before you assume permitted development applies to your street, check whether your street falls inside a conservation area or an Article 4 direction — both are common in Waltham Forest and both remove PD rights for rear and side extensions. Our London planning guide walks through the tests in order.
Party wall and neighbours
Terrace stock: two party wall notices are standard.
Serve notice at least two months before you break ground. Budget £1,200–£2,400 per adjoining owner if they dissent and appoint their own surveyor — see the Party Wall Act guide.
Access, logistics and site set-up
Rear access via a side alley or garden gate speeds up muck-away and cuts labour cost noticeably.
Every quote we issue for Wood Street prices skip permits, parking suspensions, protection and welfare explicitly in the preliminaries — so the number you sign is the number you pay.
Value added in Wood Street
Well-executed extensions here tend to return a healthy share of their cost at resale, particularly where they add a genuine third or fourth bedroom.
Typical programme
- Weeks 0–4Measured survey, design and structural calcs
- Weeks 4–12Planning or lawful development certificate, party wall notices
- Weeks 12–16Tender, builder selection and contract signing
- Weeks 16–34On site: groundworks, shell, watertight, first and second fix
- Week 35Building Control sign-off, snagging and handover
Full detail in the London extension timeline guide.