Earl's Court, London
Areas · Kensington & Chelsea · West London
Earl's Court · SW3 · SW5 · SW7

House extensions in Earl's Court

Earl's Court sits in Kensington & Chelsea, where the streets are dominated by solid brick terraces with shallow foundations and shared party walls on both flanks. The build that pays back most reliably here is a modest 3.5m rear extension under permitted development with rooflights over the island.

Typical all-in (inc VAT)
£182k–£302k
Build rate per m²
£3300–£5050
On-site programme
12–20 weeks

What we build in Earl's Court

Most Earl's Court projects we scope fall into three buckets: a side-return or rear infill that fixes a dark galley kitchen, a full-width rear extension that opens the ground floor to the garden, and a rear-plus-loft package that adds a bedroom while the scaffold is already up. Stucco terraces, mansion blocks, Georgian and early-Victorian townhouses — mostly Grade II.

Basement extensionRear infillRoof / mansard

Extension costs in Earl's Court

A mid-spec 25 m² extension in Earl's Court typically lands between £182,000 and £302,000 all-in — that figure includes professional fees, planning and Building Control, party wall, a 12% contingency and VAT at 20%. Ex-VAT build rates run £3300–£5050 per m² depending on glazing, structural spans and kitchen spend.

ProjectSizeEarl's Court all-in
Side return infill15–20 m²£137k – £227k
Full-width rear20–30 m²£182k – £302k
Wraparound30–45 m²£264k – £438k
Double-storey rear40–60 m²£355k – £589k

Planning permission in Earl's Court

RBKC is the strictest planning authority in London for extensions. Basement policy is tight (post-2015), Article 4 removes PD in most zones, and heritage officers scrutinise everything.

Before you assume permitted development applies to your street, check whether your street falls inside a conservation area or an Article 4 direction — both are common in Kensington & Chelsea and both remove PD rights for rear and side extensions. Our London planning guide walks through the tests in order.

Party wall and neighbours

Basement work almost always triggers major Party Wall Awards on both flanks — plan for surveyors on all sides.

Serve notice at least two months before you break ground. Budget £1,200–£2,400 per adjoining owner if they dissent and appoint their own surveyor — see the Party Wall Act guide.

Access, logistics and site set-up

Narrow roads limit lorry size, so materials arrive in smaller loads; a good programme allows for it.

Every quote we issue for Earl's Court prices skip permits, parking suspensions, protection and welfare explicitly in the preliminaries — so the number you sign is the number you pay.

Value added in Earl's Court

Light and layout move value here more than raw square metres — spend on glazing and ceiling height.

Typical programme

  1. Weeks 0–4Measured survey, design and structural calcs
  2. Weeks 4–12Planning or lawful development certificate, party wall notices
  3. Weeks 12–16Tender, builder selection and contract signing
  4. Weeks 16–34On site: groundworks, shell, watertight, first and second fix
  5. Week 35Building Control sign-off, snagging and handover

Full detail in the London extension timeline guide.

Why homeowners in Earl's Court use us

  • KYB-verified builders only
  • Live Kensington & Chelsea project experience
  • Itemised fixed-price specifications
  • Insurance, warranty and accreditation checks
Call now WhatsApp