South Kensington, London
Areas · Kensington & Chelsea · West London
South Kensington · SW3 · SW5 · SW7

House extensions in South Kensington

South Kensington sits in Kensington & Chelsea, where the streets are dominated by long Victorian terraces with narrow side returns and original rear closet wings. The build that pays back most reliably here is a full-width rear extension with a structural steel goalpost and sliding doors.

Typical all-in (inc VAT)
£182k–£302k
Build rate per m²
£3300–£5050
On-site programme
12–20 weeks

What we build in South Kensington

Most South Kensington projects we scope fall into three buckets: a side-return or rear infill that fixes a dark galley kitchen, a full-width rear extension that opens the ground floor to the garden, and a rear-plus-loft package that adds a bedroom while the scaffold is already up. Stucco terraces, mansion blocks, Georgian and early-Victorian townhouses — mostly Grade II.

Basement extensionRear infillRoof / mansard

Extension costs in South Kensington

A mid-spec 25 m² extension in South Kensington typically lands between £182,000 and £302,000 all-in — that figure includes professional fees, planning and Building Control, party wall, a 12% contingency and VAT at 20%. Ex-VAT build rates run £3300–£5050 per m² depending on glazing, structural spans and kitchen spend.

ProjectSizeSouth Kensington all-in
Side return infill15–20 m²£137k – £227k
Full-width rear20–30 m²£182k – £302k
Wraparound30–45 m²£264k – £438k
Double-storey rear40–60 m²£355k – £589k

Planning permission in South Kensington

RBKC is the strictest planning authority in London for extensions. Basement policy is tight (post-2015), Article 4 removes PD in most zones, and heritage officers scrutinise everything.

Before you assume permitted development applies to your street, check whether your street falls inside a conservation area or an Article 4 direction — both are common in Kensington & Chelsea and both remove PD rights for rear and side extensions. Our London planning guide walks through the tests in order.

Party wall and neighbours

Basement work almost always triggers major Party Wall Awards on both flanks — plan for surveyors on all sides.

Serve notice at least two months before you break ground. Budget £1,200–£2,400 per adjoining owner if they dissent and appoint their own surveyor — see the Party Wall Act guide.

Access, logistics and site set-up

Rear access via a side alley or garden gate speeds up muck-away and cuts labour cost noticeably.

Every quote we issue for South Kensington prices skip permits, parking suspensions, protection and welfare explicitly in the preliminaries — so the number you sign is the number you pay.

Value added in South Kensington

Adding floor area is usually cheaper than moving once stamp duty, agent fees and moving costs are counted.

Typical programme

  1. Weeks 0–4Measured survey, design and structural calcs
  2. Weeks 4–12Planning or lawful development certificate, party wall notices
  3. Weeks 12–16Tender, builder selection and contract signing
  4. Weeks 16–34On site: groundworks, shell, watertight, first and second fix
  5. Week 35Building Control sign-off, snagging and handover

Full detail in the London extension timeline guide.

Why homeowners in South Kensington use us

  • KYB-verified builders only
  • Live Kensington & Chelsea project experience
  • Itemised fixed-price specifications
  • Insurance, warranty and accreditation checks
Call now WhatsApp